Project Description
Client: Orica
Location: Kooragang Island, Newcastle
Year Completed: 2016
Job Type: Industrial cooling tower repair
Marley Flow Control was contracted by Orica to complete a significant list of repairs to their large industrial cooling tower. Due to the value of this site during its production times, the repairs needed to be carried out during a 5 yearly shutdown.
Our team completed the repairs on time in conjunction with the other activity that was taking place during the shutdown.
The success of this project was only possible due to the experience of the Marley Flow Control’s team.
The extensive work included 100% splash fill replacement, as well as full drift eliminator and structural bolt replacement, mechanical supports, anchor brackets and stair access.